Skip to content
JAVIS JAVIS Community
Login
Collapse

Outlook 2026: Chips capacity is coming, India must build buyers & supply chains

Scheduled Pinned Locked Moved Manufacturing & Industrial Supply Chains
breaking news
1 Posts 1 Posters 21 Views 1 Watching
This topic has been deleted. Only users with topic management privileges can see it.
  • RohilR
    Rohil wrote last edited by
    #1

    India has cleared the first hurdle in chips: a wave of 10 fab/SiC/OSAT investments and policy support that’s taking manufacturing capacity live over 2026–27 (CG Power says 2026; Micron now expected H1 2026 after delays; full fabs only 2027–28 at best). The make-or-break next phase is ecosystem: upstream gases/chemicals/equipment and downstream OEM demand so ATMP/fab lines aren’t reliant on imports or overseas customers.

    Today, OSATs still import key inputs like epoxy molding compounds and plating chemicals, hurting cost competitiveness; the fix is to localise materials, anchor OEM production in India, and grow fabless/product companies that actually consume locally made chips. That, not subsidies alone, will decide if the chip mission is a showcase, or a costly experiment.

    Visit YourStory

    1 Reply Last reply
    0
    Reply
    • Reply as topic
    Log in to reply
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    • First post
      Last post
    0